Boomer E2C type tunneling drill rig
Time
2022-02-14 08:55
Source:

Boomer E2C type tunneling drill rig
Dual-arm tunneling drill rig, maximum effective drilling cross-section area 112㎡

Boomer E2C fully hydraulic tunneling drill rig
Boomer E2C type drill rig with hydraulic rock drill
| Rock drill performance |
COP1838ME |
COP2238 |
| Rock drill drill rod |
R32/R38/T38 |
R32/R38/T38 |
| Rock drill center height |
88mm |
88mm |
| Rock drill length (excluding drill rod) |
1008mm |
1008mm |
| Rock drill output power |
18KW |
22KW |
| Rock drill impact frequency |
60Hz |
73Hz |
| Hydraulic system pressure |
230bar |
250bar |
| Rotary drill system |
Independent rotary type |
Independent rotary type |
| Rotary speed |
0-340 rpm |
0-340 rpm |
| Rotary torque (maximum) |
640-1100 Nm |
640-1100Nm |
| Air consumption (at 2 bar pressure) |
6~7 l/s |
7 l/s |
| Water consumption |
70~120 l/m |
70~120 l/m |
| Weight |
170 Kg |
170 Kg |
| Noise level |
106 dB(A) |
106 dB(A) |
Boomer E2C type drill rig boom parameters
| Advancing arm model |
BMH6814 |
BMH6816 |
BMH6818 |
BMH6820 |
BMH6821 |
| Total length |
5882mm |
6502mm |
7102mm |
7677mm |
7977mm |
| Using drill rod length |
4310mm |
4920mm |
5530mm |
6100mm |
6400mm |
| Drilling depth |
4043mm |
4668mm |
5268mm |
5843mm |
6i40mm |
| Thrust force |
22.0kN |
22.0kN |
22.0kN |
22.0kN |
22.0kN |
| Weight (including drill rod) |
631kg |
665kg |
696kg |
721kg |
751kg |
Boomer E2C type drill rig using drill tools Unit: mm
| Drill rod type |
Casing type |
Drill bit type |
Drill head |
| R32-H35-R38 |
R38, D=55, L=170 |
R38, D=38, L=435 |
D45 |
| R32-H35-T38 |
T38, D=55, L=190 |
T38, D=38, L=435 |
D45 |
| R32-H35-T38 MF |
|
T38, D=38, L=525 |
D45 |
| SR32-H35-T38 MF |
|
T38, D=38, L=525 |
D45 |
| SR32-H35-R38 MF |
|
R38, D=38, L=435 |
D45 |
| SR35-H35-T38 |
T38, D=55, L=190 |
T38, D=38, L=435 |
D45 |
| SR35-R39-T38 |
T38, D=55, L=190 |
T38, D=38, L=435 |
D45 |
| SR32-R39-T38 |
T38, D=55, L=190 |
T38, D=38, L=525 |
D45 |
| SR35-R39-T38 MF |
|
T38, D=38, L=525 |
D45 |

RELATED INFORMATION
Maxus Mining acquires antimony and tungsten projects in British Columbia
Maxus Mining announced Thursday it has entered an option agreement to acquire a 100% interest in one tungsten and three antimony exploration properties in British Columbia covering more than 4,100 hectares
Lundin targets top-ten copper miner status in bold expansion plan
Canada’s Lundin Mining has unveiled a strategic growth plan designed to catapult the company to the status of the world’s top ten copper producers.
SolGold to start mining copper from Cascabel in early 2028
SolGold is fast-tracking the development of its flagship Cascabel copper-gold project in northern Ecuador, with first production now expected in 2028, three to four years ahead of its original schedule
Teck approves $2.4B expansion of Highland Valley Copper
Teck Resources’ board has approved a C$2.1–C$2.4 billion ($1.6 -$1.8 bn) project to extend the life of its Highland Valley Copper Mine (HVC) in British Columbia, securing operations at Canada’s largest copper mine into the mid-2040s.
Ariana Resources nears production at Tavsan gold mine
Ariana Resources soared after the Australian gold developer announced the imminent start of production at the Tavsan gold mine in Türkiye .
Northern Minerals expands mining leases at Browns Range
Heavy rare earths company Northern Minerals has been granted a new mining lease that more than doubles the tenure area at its Browns Range project, in Western Australia’s East Kimberley.
Address: Building 35-1, Ankang Road, Lianshan District, Huludao City, Liaoning Province
WeChat Public Number
Tiktok
Copyright © 2024 Huludao Reclimbing Technology Co., Ltd. All right reserved Web :www.300.cn jinzhou.300.cn SEO Privacy policy